MECHA WAR / GAME GUIDE
Your first deployment starts in the hangar.
Mecha War: Colony Battle Royale is a free, third-person mech combat game. Customize Night, practice your boost movement, and take on AI pilots. The full game is available on CrazyGames.
Build your loadout
Your three equipment choices are paired arm weapons, a left back unit (Q), and a right back unit (E). Pick the combination that suits how you fight. Shield, cloak, and EMP are left-back options; other compatible back weapons give you ways to extend your firepower.
Earn game currency as you play and use it for parts and customization. Experiment with weapons and colors between deployments.
Choose your battle
- 1v1 Deathmatch: defeat a rival AI pilot in a duel. The first pilot to three round wins takes the match.
- 2v2 Team Battles: fight alongside an AI teammate. Choose elimination or the respawning variant, where each kill scores one team point and the first team to 20 wins.
- Battle Royale: fight for survival, collect equipment, and keep ahead of the closing battlefield until you are the last mech standing.
These are single-player battles against AI pilots. Team modes do not require an online teammate.
Move, aim, and use your equipment
| Input | Action |
|---|---|
| W A S D | Move |
| Mouse | Look and aim |
| Left mouse button | Fire arm weapons |
| Right mouse button | Focus aim |
| Shift | Dash / boost |
| Space | Jump / use jump jets |
| Q / E | Left / right back unit |
| R | Reload |
| Esc | Pause / settings |
On phones and tablets, use the on-screen controls. Check the in-game controls for mode-specific actions, and adjust graphics and sensitivity in Settings.
Fight on the ground and in the air
Use cover to break an opponent’s line of sight, watch your shield and hull, and save boost for the moment you need it. Desert, Forest, City, Canyon, and Mountain/River give you flat battlefields. Three Bands takes the action inside the curved space colony.
Where to play and save
This website introduces the game. Select Play on CrazyGames to open the playable version. Progress previously stored on mechawar.com does not automatically transfer to CrazyGames; each site has its own storage and account features. This landing page does not erase your old local pilot save.
Looking for games like Armored Core? Read a short introduction for mech-action fans.
